DO-178C expects you to review the outputs of each development process (requirements, architecture, source code, test cases, test procedures and test results) against the verification objectives in Annex A, and to keep evidence that you did. Section 6.3 treats a review as a qualitative judgment of correctness, normally an inspection guided by a checklist. For some objectives at levels A and B the reviewer must be someone other than the author. You prove it with life cycle data, mainly the Software Verification Results, that show who reviewed which version, what they found and how every finding was closed.
What is the difference between reviews, analyzes and tests in DO-178C?
DO-178C splits verification into reviews, analyzes and tests. Section 6.3 describes reviews as a qualitative assessment of correctness and analyzes as repeatable evidence of correctness. Testing is covered in section 6.4, and the test cases, procedures and results are themselves reviewed or analyzed (section 6.4.5). AdaCore's write-up of DO-178C reviews lays this out well.
The standard does not prescribe a review method. It says a review may be an inspection of a process output guided by a checklist or similar aid. Teams pick a walk-through (the author leads peers through the item) or a formal inspection (a moderator leads reviewers against fixed criteria). For anything you will show an auditor, I use the inspection style.
Analysis can replace review where it is practical. The DO-333 formal methods supplement describes where formal analysis can stand in for review, as NASA's overview of DO-178C and its supplements summarizes. AdaCore counts 31 review and analysis objectives in sections 6.3 and 6.4.5 and says that with natural-language requirements, at least 29 end up verified by review.
Which DO-178C objectives are met by reviews?
These are paraphrased. The exact wording and applicability by level are in Annex A, which you buy from RTCA, so check your level there.
- Table A-3, high-level requirements. They comply with the system requirements, are accurate and consistent, fit the target computer, can be verified, conform to the requirements standard and trace to system requirements. Algorithms in them are accurate.
- Table A-4, low-level requirements and architecture. The same questions for the low-level requirements against the high-level ones. The architecture is compatible and consistent with the requirements, and partitioning integrity is confirmed.
- Table A-5, source code. Code complies with the low-level requirements and the architecture, can be verified, conforms to the code standard, traces to requirements and is accurate and consistent.
- Table A-7, verification of the verification. Test procedures and expected results are correct. Test results are correct and discrepancies are explained. Requirements-based and structural coverage is achieved.
Table A-6 is testing, not review. Section 6.3 turns the review objectives into activities per data item, and section 6.4.5 covers test cases, procedures and results. The Plan for Software Aspects of Certification (PSAC) usually lays this out as one row per objective: the data item verified, the review or analysis that verifies it, and whether independence applies at your level.
What does independence mean for a review?
Independence means the review is done by a person other than the developer of the data under review. AdaCore cites section 6.2 for this and notes that DO-178C puts its emphasis on independence at levels A and B. By AdaCore's count, 16 of the 31 review objectives need independence at level A, 7 at level B and none at levels C or D. Confirm those numbers against Annex A for your level.
Your plans say, for each objective that needs independence, who may do the review: for example, high-level requirements reviewed by someone other than the person who wrote them, and test results reviewed by someone other than the person who ran the tests. Your review record has to name the reviewer, and your records have to make the author identifiable too. Otherwise you cannot show the objective was met with independence.
What review records does DO-178C expect?
A review is software life cycle data. FAA Order 8110.49A defines that data as what is produced to plan, direct, explain, define, record or provide evidence of activities, and notes that DO-178C describes the kinds of data in sections 11.1 through 11.22.
For reviews the central item is the Software Verification Results (section 11.14). Per AdaCore's reading, it holds the review records and the configuration information for what was reviewed, and discrepancies are tracked through problem reporting. The configuration item that was reviewed has to be identified, so the record says which version was looked at. Records have to be stored and retrievable. There is no need to export them to a document if the database stays available for audit.
Real defects found in review go into problem reports. FAA AC 20-189 (active, issued 2022-09-16) is the current guidance on managing open problem reports at certification.
How do SOI audits look at review records?
FAA AC 20-115D (active, issued 2017-07-21) recognizes DO-178C as an acceptable, but not the only, means of compliance for the software aspects of airborne systems. "Stage of involvement" (SOI) reviews are where the certification authority, or a delegated DER, samples your plans and data. Order 8110.49A says sampling is the primary way the authority assesses compliance. Its examples include inspecting traceability, reviewing analyzes, examining structural coverage, and examining quality assurance and configuration management records.
The four-stage model is older than the current order. Order 8110.49 (2003) and its Change 1 (2011) described a planning review (SOI 1), a development review (SOI 2), a verification review (SOI 3) and a final certification review (SOI 4), and cited an FAA job aid, Conducting Software Reviews Prior to Certification (Revision 1, January 2004). Change 2 (2017) deleted part of chapter 2 "to allow flexibility in conducting software reviews". The current Order 8110.49A (effective 29 March 2018, status active on faa.gov) keeps a general software review process and no longer defines the four stages. I could not find the job aid on the FAA's software policy page. The SOI 1 to 4 vocabulary is still how most programs plan their audits, so ask your DER how they run theirs.
The older text still shows what gets examined, with the caveat that it was written for DO-178B. Before a development review, requirements, architecture and code should be documented, reviewed and traceable. Before a verification review, development data should be complete, reviewed and under configuration control, and test cases and procedures documented, reviewed and under configuration control. The evaluation criteria are the Annex A objectives. Not every transition criterion has to be finished, but there should be evidence they are being applied.
What I look for in a review record, from experience:
- Who reviewed it, in what role, and whether they were independent of the author.
- When the review happened.
- The exact version of the item reviewed, not just the document number.
- The checklist used and the answers.
- Each finding, where it is in the document, and who raised it.
- How each finding was dispositioned, who fixed it, who verified the fix, and when.
- Sign-off on the version that was released, or evidence of re-review of what changed.
What do checklists and transition criteria add?
The checklist makes a review repeatable. It records which questions were asked and who answered them. Transition criteria are the gate between phases. In the older order, typical planning criteria include internal review of plans with deficiencies resolved, quality assurance evaluation, and approval under configuration control. A tool that enforces a gate (no moving on with open critical findings or an unanswered required checklist) turns a paper rule into a record.
What are the options for recording DO-178C reviews?
| Option | Deployment | Air-gap fit | Does well | Watch for |
|---|---|---|---|---|
| Email, Word comments and an Excel log | Desktop tools you already have | Works anywhere | No new tooling | Who, when, which version and closure sit in three places. The Siemens Polarion partner blog describes the audit question this setup cannot answer quickly: which independent reviewer signed off. |
| SmartBear Collaborator | Server you install; edition set by license code | Not stated on the pages I read; ask SmartBear | Word and PDF review in a Diff Viewer, comments pinned to the page, checklists, configurable workflow, e-signatures | Word, PDF and e-signatures are Enterprise-only. Track Changes must be accepted before a Word file is uploaded. |
| Jama Connect Review Center | Cloud, Customer-Validated Cloud, or self-hosted (Jama's support article labels self-hosted "Legacy - KOTS" and recommends cloud) | Self-hosted exists; check current terms | Moderator, reviewer and approver roles, checklists, e-signatures, feedback tied to a revision | Reviews are of items in Jama projects, so a Word document is imported as items first. |
| Polarion with Avionyx Reviews | Polarion On-Premise or Polarion X (cloud); the review extension is a partner product | Not stated; Siemens says server-uploaded extensions are not supported on Polarion X, so confirm | Checklist-driven reviews, comments tied to checklist item IDs, role independence, merged PDF comments, an evidence PDF | The review feature is a third-party extension, not core Polarion. |
| Lucent | Docker Compose on your servers | Runs fully air-gapped with no outbound connections | Code, PDF, Word and spreadsheets in one browser viewer, findings pinned to the page, workflow gates, checklists, sign-off per file, hash-chained audit log | Files have to be committed to Git or SVN before they can be reviewed. |
How does Lucent support a DO-178C review record?
Lucent is built around the questions an auditor asks. The product pages frame it for DO-178C, ISO 26262 and DoD environments. That is not a certification or qualification claim. Whether a review tool needs DO-330 tool qualification is your decision, made in your plans with your DER.
- What version was reviewed? A review lists each file once, at its reviewed version: the first 8 characters of a Git commit, or the SVN revision, with the commit date. Adding a second revision of a file already in the review is refused. A fix is named when a finding is implemented, and the reviewed version moves only when the fix is verified.
- Where exactly? Findings pin to a spot on a page, highlighted text, a page range, a whole document, lines of code or a spreadsheet cell. Word documents are shown as converted PDFs, so the same choices apply. See pinpoint findings and the native viewer.
- Which checklist, answered by whom? You define the templates. Each item has guidance, an answer type, a required flag and, optionally, a comment requirement on No. Each item shows who gave the current answer and when, and earlier answers stay listed. Completing the checklist records who and when, and the answers become read-only. See checklists.
- Was the gate enforced? The workflow engine guards transitions by role and precondition: no open critical findings, completed checklists, file sign-offs. The Workflow tab lists each rule as met or not met.
- Was it independently verified? A workflow setting, on by default, stops the person who implemented a finding from verifying it. Administrators are exempt, so cover that in your procedure. Rejection requires a reason. Independence of the reviewer from the document's author comes from whom you assign and which roles may sign off. The record shows both.
- Who signed what? Sign-off is per file at its version. Workflows can require approvals from specific roles, and sign-offs given, changed and revoked go to the audit log with the file and version.
- What did the program cover? When the approving state is set to record coverage, entering it records each file's reviewed version as covered, and gap analysis shows revisions never reviewed. See reporting.
- Can I show it to an auditor? Every review has a History tab, and a printable review report lists files, reviewers, sign-offs, findings, checklists and workflow history. Administrators can verify the hash chain of the audit log and export it as CSV or PDF with a title block stating the integrity result. See compliance. The check cannot see an entry removed from the end of the log, so keep the newest entry's number and hash outside Lucent.
For the document side, see how to run a formal peer review of a Word or PDF document. For the traceability objectives, see the bidirectional traceability audit.
Frequently asked questions
Does DO-178C require independent reviews at every software level?
No. Independence applies to a defined subset of objectives, most at level A and fewer at level B. AdaCore counts none for levels C and D. Check Annex A for your level before you assign reviewers.
Do review records have to be a signed document?
No. DO-178C cares that the record exists, identifies the reviewed configuration item and is retrievable for audit. A database that stays available is acceptable, per AdaCore's reading.
Are SOI audits defined in the current FAA order?
Not as four stages. They were defined in Order 8110.49 and Change 1, and part of that text was removed in Change 2 (2017). The current Order 8110.49A (2018) keeps a general review process. The SOI 1 to 4 vocabulary is still common practice, so agree the audit plan with your DER.
Can a tool replace a human review?
For some objectives, analysis can replace review, and DO-333 covers formal analysis. A tool that eliminates, reduces or automates a verification activity may need DO-330 qualification, a rule NASA's overview states. A tool that only records a human review is a different question, and you decide it with your DER.
What happens to a defect found in review?
Record it as a finding against the exact version and location, fix it, and have someone other than the fixer verify it. If it affects baselined data, it also goes through problem reporting. AC 20-189 covers managing open problem reports.
Can Lucent review Word and PDF deliverables as well as code?
Yes. It reviews code, PDF, Word (.docx) and spreadsheet files committed to a Git or SVN repository, in a built-in viewer. See Lucent.
Sources
- FAA Order 8110.49A, Software Approval Guidelines (document page) and PDF
- FAA Order 8110.49 Chg 1 (2011) and Chg 2 (2017)
- FAA AC 20-115D, Airborne Software Development Assurance Using ED-12() and DO-178()
- FAA AC 20-189, Management of Open Problem Reports
- FAA software and airborne electronic hardware policy list
- AdaCore, A Fresh Take on DO-178C Software Reviews
- NASA, Certification of Safety-Critical Software Under DO-178C and DO-278A
- SmartBear Collaborator editions and reviewing Word documents